Clifton BOE Locker Room Renovations at Clifton Stadium - 4358
Clifton BOE Locker Room Renovations at Clifton Stadium - 50$
Addenda #1
(click to expand/collapse)
Name | Size | ||
4358 - Drawing D1.1 - Add-1 24 11 11 | 1.0 MB | ||
4358 Addendum #1.doc | 73.5 KB | ||
4358 Addendum #1 | 125.3 KB | ||
Existing Drawings | 12.5 MB |
Addenda # 2
(click to expand/collapse)
Name | Size | ||
01010 - Summary of Work - ADD-2 24 11 21 | 32.3 KB | ||
4358 - Master Table of Contents - ADD-2 24 11 21 | 29.7 KB | ||
4358 Addendum #2 | 42.2 KB | ||
10505 - Metal Lockers - ADD-2 24 11 21 | 46.9 KB |